Pilot program

Prove it on
one part.

One Nano, one recurring stockout, one approved part with a clear pass/fail inspection. Scored against a rugged field printer and the normal supply line.

Machine
Nano, fully offline
Runs
10 matched jobs per printer
Decision
GO only if every gate passes

Go / no-go gates

Eight gates. All must pass.

Thresholds are agreed with the pilot operator before the first run. A missed gate or a missing baseline is NO-GO until corrected and retested.

GateGO ifHow it's scored
Part acceptance9 of 10 runs pass inspection first timeSame approved part and checklist every run
Time to accepted partMedian 25% shorter than normal replenishmentClock from request to acceptance, setup and inspection included
Heaviest single load25% below the rugged kit's heaviest loadWeigh each carried item with contents
Total kit massNo more than the fully equipped rugged kitPower, materials, tools and packaging included
Setup timeMedian 15 min or less, packed to print-readyIncludes Power Block connection and warm-up
Safety and releaseZero unsafe events, zero unapproved parts releasedPilot stops on any breach
Energy per partWarKit no higher than the rugged printerWh from the Power Block log ÷ accepted parts
Test conditionsRecorded and identical for both printersIndoor/outdoor, temperature, dust; cold starts flagged

9 of 10 is a screening result, not a qualification. With 10 runs, 95% confidence only supports a first-pass rate of about 55% or better.

Pilot kits

Candidate parts.

Each kit is approved files, materials and an inspection checklist. These are candidates, not install authorizations.

KitIn scopeExcluded
Medical supportSupply-bin dividers, carry-case inserts, equipment tagsPatient-contact, treatment, sterile, life-support
Electronics supportBench organizers, labeling fixtures, assembly aids for powered-off electronicsEnergized or protective components
Drone supportTransport-case inserts, cable organizers, bench holdersFlight or payload parts
Vehicle supportTool holders, storage dividers, staging aidsLoad-bearing, restraint, braking, steering

Roadmap

Pilot first. Product line after.

  1. Pick the part

    Choose the pilot user and a part with recurring stockouts; document today's replacement process.

  2. Agree the gates

    Set thresholds, test conditions and the inspection checklist with the operator.

  3. Run the baseline

    Ten matched jobs on WarKit Nano and on a rugged field printer.

  4. Go or no-go

    Only a GO opens Pack, Field, Base and the deployed labs.